UN Intl Women's Year 1975 Patch

You know how you refuse to give up on a favorite pair of pants when they get damaged? I’d patched these Burmuda shorts a couple of times already by hand. Then realized I could really get serious by asking fellow-cruiser Sharon on Allegro if I could u…

Refit Blog #6 – It’s Been Another Productive Week

Week 5 – October 21-26, 2013

 Below is some of what we accomplished this week:

 Dana Lebo and Bill Kennedy, owners of All Points Marine (APM), along with their crew made good progress on the glassing of the top deck extension.

 The top deck form that Randy and I built was PVA primed, waxed and then gel coated.

The gel-coated mold

 A layer of 1-1/2 oz matt went down followed by 2 more layers of 2408 biaxial matt.

 We are using a 50 gal. drum of vinyl ester resin.  If you want to know more detail about resins you can read this:

http://composite.about.com/od/Resins/a/Vinyl-Ester-Vs-Polyester-Resins.htm


  The second layer of 2408 biaxial cloth

 Paul Fredrickson, our consultant, was onboard Starr helping to detail the fiberglass connections.

 Paul Fredrickson, Randy Madison, and Dana Lebo solving problems.

 Paul has been a yacht designer and fiberglass yacht construction expert for many large vessels in the Pacific Northwest, and is a great help with our refit.

 Paul detailing connections

 We progressed in our work on the Deck drains with the inset of 1 1/2 in green thread FRP pipe.

 Randy gluing together the green thread FRP

 1-1/2 inch FRP deck drain inset on the port side

 
We reused the original back rail cap. This involved trimming in some areas and building up in other areas.

 Chris from APM prepping port rail cap.

 We re-attached the rail caps using Pro-Set ADV-276 & ADV-176 adhesive.
http://www.prosetepoxy.com

 One of the workers said that he thought the adhesive was strong enough that we would be able to lift Starr from her railing.

 Setting the rail cap

 

Randy made up templates for the new stern bulkheads.

 Randy making the bulkhead pattern

 

The stern is ready for our mold to do the 24 inch extension.

 The transom is ready for the extension

 Dana Lebo is a hard working business owner who works with his guys; Dana takes on the more difficult tasks. While Dana was doing the glassing, others on his crew were either grinding out old cracks or doing masking in preparation for priming and painting.

 

An Update:

Steve D’Antonio sent me his 20-page report, accompanied by over 500 photos. There are many valuable observations that I will be addressing, and I will be sharing them with you at a later date.

 

 Sharry and I are off to Ft Lauderdale on Wednesday to attend the boat show.

 Don

Refit Blog #6 – It’s Been Another Productive Week

Week 5 – October 21-26, 2013
 Below is some of what we accomplished this week:
 Dana Lebo and Bill Kennedy, owners of All Points Marine (APM), along with their crew made good progress on the glassing of the top deck extension.
 The top deck form th…

Well…

We had great intentions.Pulling into Beaufort just in time to make the inlet in daylight, we forged ahead with a weather forecast that appeared to be near perfect… and it was for about 3 hours.It looked so good out from Beaufort that we dropped Plan …

Grand Harbor Marina, Iuka, MS

 We left at 0820 bound for Iuka, MS and Grand Harbor Marina. 58 miles and one lock called the Pickwick Lock.  Eddie took his shift at the helm.

 Nice cruising on the TN River.

 Nice camp along the river built from sh…

Grand Harbor Marina, Iuka, MS

 We left at 0820 bound for Iuka, MS and Grand Harbor Marina. 58 miles and one lock called the Pickwick Lock.  Eddie took his shift at the helm.

 Nice cruising on the TN River.

 Nice camp along the river built from sh…

Kilmarnock, VA to New Bern, NC (October 2013)

After a last dinner on Carolyn Ann with Tom and Doris, we left Chesapeake Boat Basin and cruised down to Hampton Maritime Center.  We’d stopped there in the spring and joined their preferred customer club – which would give us reduced dockage ra…

Kilmarnock, VA to New Bern, NC (October 2013)

After a last dinner on Carolyn Ann with Tom and Doris, we left Chesapeake Boat Basin and cruised down to Hampton Maritime Center.  We’d stopped there in the spring and joined their preferred customer club – which would give us reduced dockage ra…

Our last cruise for the season

Our last cruise for the season from Lefkas marina to Cleopatra marina in Peveza. But first fill the tanks so as to eliminate as much as possible condensation in the tanks during winter layup. Two pumps, one for each tank. The filling station can not be…

Our last cruise for the season

Our last cruise for the season from Lefkas marina to Cleopatra marina in Peveza. But first fill the tanks so as to eliminate as much as possible condensation in the tanks during winter layup. Two pumps, one for each tank. The filling station attendant …