[MV Starr] Hawaii to Seattle

Hawaii to Seattle-2300nm
Day 3 – 1900nm to go
4/12/16, 1900Z
26 27 W, 153 43, N
COG 40 deg T
SOG 7.8 kts
Wind NE 20-25 kts
Seas 8-12 ft ,  (on our starboard fwd quarter and bow)

Departing Kaneohe Bay on Oahu – 1900 Z – April 10 21deg30N/157deg49W

Departing Kaneohe Bay on Oahu – 1900 Z – April 10

21deg30N/157deg49W

Today is the start of day three.  We have covered 380nm on a rhumb line to Seattle.

Joe Golberg has done numerous ocean passages on sailboats, and now is doing his first extended passage on a powerboat.  Joe commented how much there is to do, even though our watches are 3 hours on and 9 hours off. 

Here are a couple of examples:  the water makers would run a short time and then shutdown due to inadequate sea water flow. We re-cleaned the already clean sea strainers, and back flushed with a garden hose to clear any possible obstructions.  The seawater feed line is completely clear, yet the water makers continued to shutdown.  We have finally come to the conclusion that due to our pitching and rolling we are just picking up too much air into the system. 

Yesterday afternoon Joe was headed to his bunk for some shuteye and found his carpets wet with seawater.  Here is Joe’s take on that: 

“I thought that on a powerboat we just set a waypoint for Cape Flattery and watch the waves go by”. To find the leak we ended up removing paneling, a shelf under windows; we used a 5½in skill saw to rip out the old shelf, a Fein saw, hammers, pry bars, and wedges, major demolition!  (Sharry was practically in tears watching our beautiful guest stateroom get trashed.)

We found what we think is the culprit:  a hull window that is awash as we roll and power through the seas.  The Good News is that we think we know where the water is coming in; the Bad News is that it will have to wait until we are back in Seattle for repairs.  It appears that the water has been coming in for a while. 

Don trashing the guest stateroom, looking for the seawater leak.

Don trashing the guest stateroom, looking for the seawater leak.

Joe helping

Joe helping

Sharry helping with her 51/2  inch skill saw-not very happy!

Sharry helping with her 51/2  inch skill saw-not very happy!

Additional problems for Don & Joe:

We have also been dealing with pesky technology with bugs in satellite communications, weather routing etc.   In trying to get it all sorted out it seems that all of the parts should talk to each other seamlessly, but they never do.

And even more fixes: 

On day one, when it was very hot, our new 3-ton Northern Lights Technicold chiller died.  It has been making funny grinding noises since it was new, and lucky for us it is under warrantee, so Northern Lights has a new replacement waiting at the dock when we get home to Seattle.  Lucky us, Don had a backup spare, which is working fine. 

On the recommendation of Brian O’Neill on Shibui, Don purchased 2 new fancy-smancy personal Ocean Signal MOB-1 ebirbs that attach to a lifejacket and activate immediately on immersion, giving an AIS signal and a piercingly Loud DSC alert on our VHF radio.  Donna was able to get one working and other will go back to West Marine to be replaced. 

The GOOD NEWS IS:

The Espresso Machine is working great (but it has been too rough for Sharry to drink coffee) and the Soda Stream is making lots and lots of bubbly water. 

We have lots of food that you don’t have to cook in rough seas.

Donna has done a really good job revising out Starr Operation Manuals in Power Point to make it easier for our friends/crew to know what to do in the Pilot House and Engine Room.

We are a really compatible 4-some and thoroughly enjoying cruising together.

More later.

Don, Sharry, Joe & Donna

Start your own blog now! Free!

[MV Starr] Hawaii to Seattle


Hawaii to Seattle-2300nm Day 3 – 1900nm to go 4/12/16, 1900Z 26 27 W, 153 43, N COG 40 deg T SOG 7.8 kts Wind NE 20-25 kts Seas 8-12 ft ,  (on our starboard fwd quarter and bow)   Departing Kaneohe Bay on Oahu – 1900 Z – April 10 21deg30N/157deg49W Today is the start of day three.  We have covered 380nm on a rhumb line to Seattle. Joe Golberg has done numerous ocean passages on sailboats, and now is doing his first extended passage on a powerboat.  Joe commented how much there …

April 12 – Beaufort, SC

Downtown Marina Mooring Ball

“Let the sea breeze blow your hair, let the sunset bring tranquility to your heart, let the distant places you travel allow you to explore yourself.” —Somya Kedia

Today we woke up to drizzling rain but there was no wind, so it meant it was a good traveling day. We shoved off in our rain gear…after enjoying our free Krispy Kreme doughnuts provided by the marina. They taste so good and seem so light when you eat them, but a little later you feel like you have a lead weight sitting in your stomach. Good thing we decided against staying here for a week.
CONTINUE READING HERE…»

Bimini to Great Harbour

  Today is a long travel day of 97 miles to Great Harbour. The seas are calm but thunderstorms are forecast later this afternoon. Our route today takes us to the north end of Bimini where we pick up the Moselle Bank Channel at North Rock Light. This is basically a small rock with a […]

Bumper Day!

Today the winds finally died down enough that Dylan and Dee Dee could get back to the critical task of bumper chasing.Most days the beach is pristine.But after days of crashing waves it looked like this. Filled with all sorts of sea grass and other lif…

Does Size Matter In Navigation Monitors?

One of the reasons we decided to go with Simrad for our electronics was their ability to be used with …Read More

Haul Out Time

2016-03-Haulout-033xIt has been three years since we last had the boat hauled out and recoated the bottom with anti-fouling paint.  Besides the bottom, we always have a list of other projects that we are either unable or unwilling to do ourselves.  Since we’re in the boatyard, we like to take advantage of the skilled people and tools they bring to the tasks.

We returned from Arizona a week or two earlier than we might have otherwise to make sure that we had adequate time for the boatyard but also not delay the start of our cruise.  We left Arizona Sunday, March 13, for the migration and arrived in Bainbridge Island on March 15.  While our cats, Annie & Maggie, do not enjoy the drive, they tolerate it better each trip.  They even use the litter box we’ve provided as we drive along.  Marcia tends to their needs while I drive.

Once on the boat, we checked all the systems to make sure they still worked and got the boat ready for the 36 mile trip to Port Townsend where the work would take place.  Everything was good and we left pre-dawn on Sunday, March 20 to beat the arrival of high winds in the afternoon.  Sure enough the winds were starting to pick up to the upper teens as we docked in Port Townsends Boat Haven shortly before noon.

2016-03-Haulout-003xWe were intending to do a sea trial with a couple of people from the boatyard we were using, Port Townsend Shipwrights Coop (PTSC), the next day, Monday, March 21, but the winds were still blowing in the 20’s so we postponed it to the Tuesday morning before our haul out when winds were forecast to be calmer.

Tuesday morning we did the sea trial and got the rudder to make the noise that we wanted the PTSC people to hear.  We then headed into the slip where the travel-lift picked us up in the slings and transported us to the yard where we’d be for the next 15 days. 

2016-03-Haulout-006xIt was striking how much stuff had grown on our hull since we last had a diver (about a year ago), clean off our bottom while we were at the dock.  These two photos show the before and after state of 2016-03-Haulout-031xapproximately the same area near the rudder post and top of the rudder.

Living on the boat on the hard while work is being performed has its pluses and minuses.  On the negative side is the necessity to minimize your onboard water use since we can’t dump anything from our holding tanks.  The positive side is that we can answer questions and make decisions on any issues that come up while the work is being done.  Also, we are able to do boat projects ourselves that would be more difficult while in the water.

We came in pretty close to the budget that PTSC estimated based on the work statement we provided them.  Since we had a lot of “inspect and repair” items, some things ending up being more while others were less.  The biggest unplanned expense was the new driveshaft we had to have fabricated on account of the pit corrosion discovered in ours when it was removed.

Below is a list of the major work (not an exhaustive list) done:

  1. Power train inspected and repaired (included new shaft)
  2. Steering system inspected and repaired
  3. New house bank batteries
  4. Bottom painted
  5. New chain
  6. Regalvanized anchor
  7. Rigging inspected and repaired

We were relaunched on April 6 and did a sea trial to make sure everything was still working and the issues we identified addressed.

The next day we headed up to Anacortes to have our furnace serviced.  As we traveled along the west shore of Whidbey Island toward Rosario Strait, we crossed paths with Shearwater, a classic Diesel Duck owned by David Cohn.  He keeps his boat in Anacortes and was heading south for a visit with friends in Poulsbo.  We took advantage of our passing by taking photos of each other.

IMG_6998x

2016-04-003x

After a night’s stay in Anacortes, we headed up to Echo Bay on Sucia Island for a couple of nights at anchor.  This gave us a chance to make sure things were working well and ease back into cruising mode.

On Sunday, April 10 we left Sucia Island heading south toward Puget Sound.  Coincidentally, we again encountered Shearwater but this time our directions were reversed and David was making his way back to Anacortes.  Since David, as are we, is returning to SE Alaska this coming season and we expect to meet him even more this summer.

Rather than heading back into Eagle Harbor, we anchored for the night in Port Madison on the north end of Bainbridge Island.  The next day we headed down to Des Moines Marina to top off our fuel tanks for the upcoming cruising season.

Now back in Eagle Harbor at the QCYC outstation, we are devoting ourselves to provisioning and putting the finishing touches on things.  Our plan is to leave around the end of April.

April 11 – Thunderbolt, GA

Thunderbolt Marina

“The most important thing is to enjoy your life—to be happy—it’s all that matters.”―Audrey Hepburn

It was a wonderful day to spend exploring Savannah…just warm enough for shorts but not hot enough to break a sweat as we walked from one beautiful sight to another. We walked a total of 6.92 miles today (I have a phone app that keeps track).
CONTINUE READING HERE…»

Another Walk

We waited until the afternoon for our trip to the beach as the predictions were for the winds to die down. They didn’t.So the crew enjoyed another walk down the beach. Fingers crossed that tomorrow will be another bumper chasing day.

April 10 – Thunderbolt, GA

Thunderbolt Marina

“The impulse to travel is one of the hopeful symptoms of life.” ― Agnes Repplier

Today we arrived in Thunderbolt which is a suburb of Savannah. As soon as we were docked and settled in we called Uber and went into Savannah with Charlotte and Magnus. We spent the afternoon walking through a few of the beautiful parks and squares. Charlotte and I did a little shopping while the guys figured out where we should have dinner.
CONTINUE READING HERE…»