Our last post spoke too
soon as no
sooner had I mentioned
NZ’s
return to
unrestricted cruising than the Auckland level 3 lockdown commenced on
12 August until
the 30th.
This time there was no room for confusion as all forms of boating
were clearly identified as not permitted.
Well
Spring is here if you go by 1 Sept, or nearly here if you go by the
Equinox of 23 Sept. Regardless the cruising is going to get better.
Di
and I rarely do cruises under several days and prefer cruises of ten
days or more. With this in mind our next project is to cruise for
about a
month from mid October to re-visit one of our favorite areas, the
eastern side of Coromandel Peninsula including The Mercury Islands
and Mercury Bay. For part of this time we’ve rented a berth at
Whitianga Marina for a very reasonable $40 per night (in the Med we’d
pay three or four times this) making it easier for family and friends
to join us. I
plan to cover that trip extensively in the Blog and
we’ll also be publishing an article in the Pacific Powerboat
magazine about it.
I
want to talk a bit more about our new Salthouse 52, “Rapport”.
When
we bought the boat we definitely knew
she had “good bones” and presented extremely well with extensive
upgrades including engines and gearboxes removed
and rebuilt
900 hours previously, new Furuno electronics, recently added water
maker, new house and start batteries and exterior repaint. The survey
confirmed her good condition, but as they invariably do it
also
identified a few issues needing attention.
Over
the last few months we’ve attended to these issues as well as a
host of other improvements to convert her from a full-on game fishing
boat to a comfortable cruising boat. Much
of this process has
been
making existing equipment work correctly.
Some
of the more major projects have been:
1.
Projects
we expected to do:
-Purchase
of new Aquapro SLR 2.6 rigid alloy hulled inflatable with Honda 2.5hp
4stroke outboard to
replace the poor condition RHIB that came with our purchase
-The
pulpit was poorly mounted and attached only to the teak decking
rather than being through bolted.
It
was removed and tidied up, an access hole made in the fore peak so
the pulpit could be bolted to the alloy deck, the teak deck was
thoroughly dried and the pulpit was properly and rigidly bolted
down in a
bed of sealant
-Paint
blisters under the beltings (where the hull meets the deck) on both
sides were opened, the alloy underneath ground back, treated for
surface oxidation, filled, faired and painted
-Replacing
cutless bearings
–Installing
a high volume sea water wash
down pump in the cockpit
-Sourcing
new spare pumps for fresh water circulation, sewage holding tank
discharge and grey water holding tank discharge. We
always prefer to have critical spares like these on board
–Upgrading
safety equipment including
extinguishers, flares, lifejackets, EPIRB, hand held vhf, binoculars,
smoke detectors and horseshoe buoy
-Installing Venetian blinds in saloon to protect furnishings from sunlight and
provide more night time ambiance
-Installing
a 101L capacity electric freezer on the flybridge so
that we’re not totally reliant on the existing freezer with its
engine driven compressor and
have an
operating
freezer while in marinas
-There
were no tools aboard so we put together a very comprehensive tool kit
including some power tools plus a wide range of chandlery items for
undertaking on board R&M
2
Unexpected projects:
–Installing
new Maxwell 3500 VWC windlass complete with spare electric motor
-Replacing
a non-working alternator
-Replacing
PSS prop shaft seals
with Kiwi seals
including replacement of all bearings. At this time the prop shafts
were also crack tested and straightened by Henleys, then realigned.
The props were checked and found to be in good shape
-Comprehensive
service of genset including installation of primary filter,
recondition of heat exchanger and some electrical work. Supply
of 220V charger for genset battery
-Replacing
all
Teleflex hydraulic steering hoses and many fittings
-New
batteries
for second house battery bank mainly
used for
powering 12V equipment
–There
was a large amount
of electrical work to make existing equipment function correctly,
rewire
breakers that didn’t perform their correct function, instal new
power outlets etc
Apart
from the above PSS shaft seal issue we’ve not encountered any
problems during our ownership except for a leaking fresh water
circulation pump (solved with a new outlet fitting), a loose wire on
our genset’s starting circuit and a failed high voltage shunt which
turned out to be redundant and not needing replacement.
now we’re down to a final few projects including an
exterior sun shade for saloon
bow facing windows, cockpit canopy, safety
rails around flybridge access hatch and gas assisted struts for an
extremely heavy lazarette hatch. Then hopefully all set for 2020/21 cruising.




